
Quality & Compliance
Export-ready QC for food-contact stainless appliance parts
Structured IQC → IPQC → OQC pipeline with material traceability and third-party testing coordination for US and EU export channels.
What we control
- ISO 9001-aligned quality management
- LFGB, FDA, RoHS, REACH testing coordination via SGS and partners
- Material certificates and OQC reports per shipment on request
- AQL sampling per agreed inspection plan
Equipment
- Dedicated QC lab and inspection stations
What evidence we can provide
Process samples, drawing based feasibility feedback, inspection criteria, sample approval records, and product or market documentation can be coordinated according to the project.
What to send us
Share a drawing, sample, photo, material target, finish, volume, and target market. We will identify missing inputs before recommending the next gate.
Quality system — one view
Four in-process gates plus export compliance documentation on request.
IQC
Incoming material
Coil/strip verification before release to floor — grade, gauge, and surface.
FAI
First article
Full dimensional check after die change or daily start — production holds until sign-off.
IPQC
In-process
Scheduled patrols on critical dimensions, weld, and cosmetic standards.
OQC
Outgoing
Final AQL with shipment inspection report available per PO.
What buyers should evaluate
A capability page should help you decide whether our process fits your part before you send a full RFQ package.
- •Is the part a stainless bowl, cup, shell, container, cover, or stamped appliance component?
- •Does it need repeat production rather than one-off trading supply?
- •Are food-contact finish, hub fitment, welding, or cosmetic requirements part of the risk?
- •Can the project justify DFM review, tooling discussion, and signed sample control?
What to send for DFM
For a practical go/no-go review, include as much of the following as possible. If drawings are sensitive, NDA first is fine.
- •2D/3D drawing, STEP/IGES/SolidWorks file, or golden sample photos with key dimensions
- •Material grade, thickness, finish, and target market
- •Annual volume tiers and expected launch date
- •Critical fit points such as hub interface, rim circularity, weld strength, or cosmetic surface limits
Related appliance programs
Low-risk first step
No purchase obligation. Share a STEP/IGES/PDF, reference photo, or golden sample description — engineering replies with feasibility and a quotation path.
Typical first response within 1 business day (WhatsApp often faster for Asia/EU time zones).