
Tooling & Molds
Owned tooling plus protected customer mold management
Tooling support and mold asset management — faster feasibility checks, controlled lead times, and clear protection rules for customer-funded OEM molds.
What we form
- 60+ owned molds for common bowl and container development references
- 200+ customer molds stored, maintained, and used only by agreement
- DFM before tooling commitment — draft, wall, and hub review
- T1/T2 sign-off with dimensional and cosmetic reports
- Customer mold ownership, NDA protection, and maintenance logs per agreement
Equipment
- In-house mold design and CNC toolroom
What buyers should evaluate
A capability page should help you decide whether our process fits your part before you send a full RFQ package.
- •Is the part a stainless bowl, cup, shell, container, cover, or stamped appliance component?
- •Does it need repeat production rather than one-off trading supply?
- •Are food-contact finish, hub fitment, welding, or cosmetic requirements part of the risk?
- •Can the project justify DFM review, tooling discussion, and signed sample control?
What to send for DFM
For a practical go/no-go review, include as much of the following as possible. If drawings are sensitive, NDA first is fine.
- •2D/3D drawing, STEP/IGES/SolidWorks file, or golden sample photos with key dimensions
- •Material grade, thickness, finish, and target market
- •Annual volume tiers and expected launch date
- •Critical fit points such as hub interface, rim circularity, weld strength, or cosmetic surface limits
Related appliance programs
Low-risk first step
No purchase obligation. Share a STEP/IGES/PDF, reference photo, or golden sample description — engineering replies with feasibility and a quotation path.
Typical first response within 1 business day (WhatsApp often faster for Asia/EU time zones).